Hardware Prerequisites

Below is the minimum hardware requirement for the HCL CDP deployment.

VMs

Server/Node CPU Memory
Bastion host 2 vCPUs 4 GB
Aerospike DB 4 vCPUs 8 GB (x2)
Druid server r5.4xlarge: 16 vCPUs 128 GB (x2)
Mongo DB Server

m5ad.xlarge – 4 vCPU / 8 GB RAM (x4),

t3a.small – 2 vCPU / 2 GB RAM

(arbiter)4 vCPUs

8 GB (x4)

2 GB

Nifi DB r5d.large – 2 vCPU 16 GB RAM (x3)
Postgres m7i.large – 2 vCPU 8 GB RAM (x2)
Redis & RMQ for Celery r5.large – 2 vCPU 16 GB RAM

EKS Cluster Nodes

Server/Node Instance Type CPU Memory
3 Nodes c7i.8xlarge 32 vCPUs 64.0 GiB
18 Nodes m7i.xlarge 4 vCPUs 16.0 GiB

EMR Cluster Nodes

Server/Node Instance Type CPU Memory
Primary Node m5.xlarge 4 vCPUs 16 GiB
Core Node m5.xlarge 4 vCPUs 16 GiB