Generating Pipeline snapshot report

The Pipeline snapshot report displays a snapshot of the pipeline for a specific value stream.

Before you begin

You must install and integrate Handlebars Reporter plugin with DevOps Velocity. For more information, see Handlebars Reporter plugin documentation.
Note: You must use Handlebars Reporter plugin version 2.0.5 or later to get accurate metrics in Individual Measures section.

About this task

The Pipeline snapshot report page provides details about the pipeline view for a value stream on a particular date.

Procedure

  1. Click Insights > Reports.
  2. Select the Pipeline snapshot field under the Report Templates heading on the left side of the page.
    Note: When the Pipeline snapshot field is selected, a vertical blue bar is displayed on the left side of the field to indicate that it is the report to run.
  3. Click Run Report to open the RUN REPORT window.
  4. Enter the following information:
    • Value Stream - Select the value stream from the drop-down list.
    • Snapshot Date - Select the date for the pipeline snapshot.
  5. Click Confirm to run the report.

Results

The Pipeline snapshot page displays the following information about the report:

  • Date: Shows the date, time, and email address of the user who ran the report.
  • Status: Shows the color-coded status: Orange = STARTED, green = COMPLETE, and red = FAILED.

The following elements provide detailed information about the report:

  • View log: When you click View log, the log details of the report are displayed.
  • View parameters: When you click View parameters, the VIEW PARAMETERS OF EXECUTION window opens and displays the details used to run the report.
  • Share: When you click Share, the URL is copied so you can share the report.
  • Results: When you click Results, the Pipeline snapshot report page is displayed. You must then click Export to CSV to export the pipeline snapshot report.

A sample pipeline snapshot report page is shown as follows: