v2.1.6+Task run history
The task run history view provides comprehensive historical data for any specific task, extending beyond the scope of the current plan. While standard system behavior restricts you to viewing task runs within the current active plan, the task run history action opens a breadcrumb view that allows you to easily access and review historical data from previous plans.
Overview
You can configure the task run history view by adding fields to the table configuration. To efficiently locate specific information within this comprehensive historical view, use the filter feature to refine data based on multiple fields, such as status, job number, and scheduled time.
Perform the following steps to view task run history:
- From the home page, click the Monitor tab.
- Select task from the drop-down list.
- Select the specific task, and then click More Actions.
- Select the Task Run History option from the drop-down list.
You can add the following fields to the table configuration to display their details.
Click the overflow menu and then select Table configuration
to view the available options. You can then filter by these fields to view
information about specific tasks.
-
- Status
- The status of the task.
-
- Internal status
- The internal status of the task.
-
- Task definition name
- The name of the task definition on the database.
-
- Task number
- The unique task ID assigned to each task when it starts running.
-
- Workstation (Task)
- The name of the workstation on which the task was launched. It is selected by default and cannot be cleared.
-
- Workflow
- The workflow on which the task is defined.
-
- Workstation (Workflow)
- The name of the workstation. It is selected by default and cannot be cleared.
-
- Scheduled time (Workflow)
- The timestamp used to identify every single instance among multiple instances of the same job stream. This value is provided by the user by associating the job stream to a run cycle. For a job, this value is the one assigned to its job stream. The time is expressed in the Dynamic Workload Console time zone, which is set in the user preferences panel.
-
- Actual start
- The time at which the task actually started, if it has completed running.
-
- Actual end
- The time at which the task ended, if it has completed running.
-
- Started late
- The delay expressed in milliseconds for a task that started late.
-
- Ended late
- The delay expressed in milliseconds for a task that ended late.
-
- Actual duration
- The actual duration of the task, if it completed running.
-
- Long duration
- If the task lasted longer than planned.
-
- Return code
- The return code assigned to the task.
-
- Run date
- The run date of the task.
-
- Planned duration
- The planned duration of the task.
-
- Error code
- The error code assigned to the task.
-
- Rerun number
- The number of the rerun task.
-
- Critical
- This value indicates if this task has been marked as critical when it was included into a workflow.
-
- Rerun type
- The task rerun type. Possible values are:
- Task every
- Task recovery
- Task rerun
-
- Total CPU time
- The column on the Duration Table in the Report Output.
-
- Critical latest start
- The latest time within which the task can start without causing the critical task miss its deadline.