Verifying installation of a controller and dialogs

When you have completed the installation tasks for a Z controller, perform its initial verification. Because connections and submission of work cannot be verified in isolation, you can perform further verification of the Z controller after you have installed the controlling system, established connections between HCL Workload Automation for Z systems, and created a current plan. For a detailed description of these verification tasks, see Verifying configuration.

To initially verify the Z controller, perform the following steps:
  1. Ensure that you have completed the installation tasks.
  2. Start the Z controller, and check the message log (EQQMLOG).
  3. Check that you can access HCL Workload Automation for Z data via the dialogs, and that authority checking is functioning as required.

If you encounter an error during verification, see Performing problem determination.