Checking the status of the current plan
Option 6 GENERAL provides details about the current plan, such
as the following:
- Creation date and time
- End date and time
- When the last current plan backup was taken
- When the first event was written to the job-tracking-event log since the latest backup of the current plan
- If a new current plan is being produced
- If a new current plan has been produced and is being brought into production
- The ddname of the following resources:
- Current plan
- Job-tracking-event log
- JCL repository
- The current MLOG data set in use
The panel is shown in EQQSGCPP - Browsing general current plan information.