Checking the status of the current plan

Option 6 GENERAL provides details about the current plan, such as the following:
  • Creation date and time
  • End date and time
  • When the last current plan backup was taken
  • When the first event was written to the job-tracking-event log since the latest backup of the current plan
  • If a new current plan is being produced
  • If a new current plan has been produced and is being brought into production
  • The ddname of the following resources:
    • Current plan
    • Job-tracking-event log
    • JCL repository
    • The current MLOG data set in use

The panel is shown in EQQSGCPP - Browsing general current plan information.

Figure 1. EQQSGCPP - Browsing general current plan information
EQQSGCPP --------- BROWSING GENERAL CURRENT PLAN INFORMATION ---------------
Command ===>

Current plan created     : 18/04/03 10.47
Planning period end      : 19/04/03 23.00


Backup information:
 Last CP backup          : 18/04/03 10.48
 First logged event
  after backup           : 18/04/03 10.49   Time stamp:   0003108F 08460341


Daily planning status:
 Under production        : No
 NCP ready               : No
                                                                
                                               

In use ddname of:
 Current plan            : EQQCP1DS
 Job-tracking log        : EQQJT03
 JCL repository          : EQQJS1DS
 Current MLOG            : EQQMLOG2