Scheduling
The trimming process can take a long time, especially if there is a high volume of reporting data to update. It should be defined to be run during off-peak hours.
In particular, the URL (Normalized)
dimension
that is provided by Discover can
generate a high number of values in a short period of time, and since
it appears in various performance reports that are provided by Discover as well as any user-defined
reports referencing the dimension, trimming of the dimension can require
a great deal of updating of the report data, which is resource-intensive.
- An early scheduling ensures that other processes scheduled for off-peak hours, such as scorecard calculation and scheduled reports delivery, can use the most up-to-date dimension values.
- For more information about cycling services, see "Configuring the Scheduling Service" in the Unica Discover Configuration Manual.
In the Data Collector setting of the Unica Discover Settings category of the Portal Management page, you may configure the following settings to define the scheduling of dimension trimming:
- Setting
- Description
Dimension Trimming - Time of Day
- The time of day when the Data Collector run occurs to trim dimension
values. Note: Discover recommends scheduling dimension trimming as early as possible after Discover users are no longer using the system for the day.
Dimension Trimming - Day of Week
- Day of week to run the dimension trimming. This setting does not apply to daily trimming operations.
Dimension Trimming - Frequency
- How often dimension trimming occurs:
Daily
,Weekly
, orMonthly
.
See "Discover Settings" in the Unica Discover Administration Manual.