Monitoring a cross dependency resolution in the current plan
Shadow jobs are added to the plan in the same way as any other
job:
- At run time, if a shadow job is added to an occurrence existing in the current plan or if a new occurrence containing the shadow job is added to the current plan.
- When the plan is extended or created again and its time frame includes the shadow job input arrival time.