at
Specifies a time dependency. If the at keyword is used, then the job or job stream cannot start before the time set with this keyword.
Syntax
at time [timezone|tz tzname][+n day[s]]
Arguments
- time
- Specifies a time of day. Possible values can range from 0000 to 2359.
- tzname
- Specifies the time zone to be used when computing the start time. See
Managing time zones for time zone names. The default
is the time zone of the workstation on which the job or job stream is launched. Note: If an at time and an until or deadline time are specified, the time zones must be the same.
- n
- Specifies an offset in days from the scheduled start date and time.
Comments
If an at time is not specified for a job or job stream, its launch time is determined by its dependencies and priority and its position in the preproduction plan is determined by the value assigned to the schedtime keyword. For more information about the schedtime keyword refer to schedtime.
If the run cycle and job stream start times are both defined, the run cycle start time takes precedence when the job stream is scheduled with JNextPlan. When the job stream is launched with the submit command, the run cycle start time is not used.
- If the time value is less than the value set in the startOfDay global option, it is taken to be for the following day.
- If the time value is greater than the value set in the startOfDay global option, it is taken to be for the current day.
If neither the at nor the schedtime keywords are specified in the job stream definition then, by default, the job or job stream instance is positioned in the plan at the time specified in the startOfDay global option.
Examples
The following examples assume that the HCL Workload Automation processing day starts at 6:00 a.m.
- The following job stream, selected on Tuesdays, is launched no
sooner than 3:00 a.m. Wednesday morning. Its two jobs are launched
as soon as possible after that time.
schedule sked7 on tu at 0300: job1 job2 end
- The following example launches job stream mysked on Sundays at
8:00 a.m.. Jobs job1, job2, and job3 are all launched on Sundays.
schedule mysked on fr at 0800 + 2 days : job1 job2 at 0900 job3 follows job2 at 1200 end
- The time zone of workstation
sfran
is defined as America/Los_Angeles, and the time zone of workstationnycity
is defined as America/New_York. The following job stream is selected to run on Friday. It is launched on workstationsfran
at 10:00 a.m. America/Los_Angeles Saturday.job1
is launched onsfran
as soon as possible after that time.job2
is launched onsfran
at 2:00 p.m. America/New_York (11:00 a.m. America/Los_Angeles) Saturday.job3
is launched on workstationnycity
at 4:00 p.m. America/New_York (1:00 p.m. America/Los_Angeles) Saturday.sfran#schedule sked8 on fr at 1000 + 1 day: job1 job2 at 1400 tz America/New_York nycity#job3 at 1600 end