Getting Started with the Upgrade
When you are ready to begin your upgrade, complete the following steps just before you
begin your upgrade.
Stop traffic: Traffic must be stopped into the Canister.
In HBR environment: If you deployed an HBR server, you can manage
traffic through the HBR. See Stopping Traffic at the HBR .
In non-HBR environment: If you do not use HBR, you can stop traffic
through Search Server. See Stopping Traffic into Each Canister .
Complete a Data Collector run: Allow one Data Collector run to
complete before you begin the upgrade. See Completing Data Collection .
Configuring HBR or HBREx You must configure HBR or HBREx on your system before the upgrade
Stopping Traffic at the HBR In an HBR environment, there is no need to stop traffic. As soon as a Processing Server is no longer available to receive hits, traffic is diverted to other available Processing Servers or spooled locally to the HBR disk until servers become available.
Stopping Traffic into Each Canister Before upgrading, traffic must be stopped into the processing pipeline of each Discover Canister.
Completing Data Collection After traffic stops and immediately before you begin upgrading your Unica Discover platform and core applications, you should verify that the latest execution of the Data Collector is complete.
Remove Canister Spool Files To remove the Canister spool files from your existing Unica Discover installation:
Have feedback?
Google Analytics is used to store comments and ratings. To provide a comment or rating for a topic, click Accept All Cookies or Allow All in Cookie Preferences in the footer of this page.