ADLAT – User-defined late operation
Use the ADLAT
statement to specify your own settings by which an
operation is to be considered late, and the alerts or actions to be taken.
ADLAT
statement is available only starting from
HCL Workload Automation for Z V9.5. Keyword | Description |
---|---|
ACTIONACT |
Specifies the action to be
taken if the operation has not yet started when
the specified day and time is reached. If you
specify an action,
ACTIONDD and
ACTIONDT are required.
Allowed values are:
|
ACTIONBASE |
Always
F . It means that the input
arrival time of the operation is used as the base
date to apply the offset. |
ACTIONDD |
Specifies the day offset,
related to the application start day, used to
check if the operation has not yet started. If the
operation has not started, the action that you set
is taken. It can be a value from 0 to 99 (where 0 means the start day, 1 means one working day after the start day, and so on). This check is applied only to operations with status Ready. |
ACTIONDIR |
Always
A (After). It means that
the day offset and time are always added, and
never subtracted, to the base date. |
ACTIONDT |
Required if you have set
ACTIONDD . Specifies the
time, related to the application start day, used
to check if the operation has not yet started. If
the operation has not started, the action that you
set is taken. This value is specified in the format HHMM. This check is applied only to operations with status Ready. |
ALERTBASE |
Always
F . It means that the input
arrival time of the operation is used as the base
date to apply the offset. |
ALERTDD |
Specifies the day offset,
related to the application start day, used to
check if the operation has not yet started. If the
operation has not started, an alert message is
issued. It can be a value from 0 to 99 (where 0 means the start day, 1 means one working day after the start day, and so on). |
ALERTDIR |
Always
A (After). It means that
the day offset and time are always added, and
never subtracted, to the base date. |
ALERTDT
|
Required if you have set
ALERTDD . Specifies the
time, related to the application start day, used
to check if the operation has not yet started. If
the operation has not started, an alert message is
issued. This value is specified in the format HH.MM. |