Using a default calendar name
HCL Workload Automation for Z sometimes
needs a calendar when it substitutes variables.
The subsystem looks for a calendar in this sequence:
- An explicitly specified calendar, connecting the calendar name to the application occurrence
- When you have manual job setup, and only for variables resolved at the setup phase, the calendar specified in the OPTIONS panel
- The calendar called DEFAULT