Checking the status of the current plan
Option 6 GENERAL provides details about the current plan, such
as the following:
- Creation date and time
- End date and time
- When the last current plan backup was taken
- When the first event was written to the job-tracking-event log since the latest backup of the current plan
- If a new current plan is being produced
- If a new current plan has been produced and is being brought into production
- The ddname of the following resources:
- Current plan
- Job-tracking-event log
- JCL repository
- The current MLOG data set in use
The panel is shown in EQQSGCPP - Browsing general current plan information.
EQQSGCPP --------- BROWSING GENERAL CURRENT PLAN INFORMATION ---------------
Command ===>
Current plan created : 18/04/03 10.47
Planning period end : 19/04/03 23.00
Backup information:
Last CP backup : 18/04/03 10.48
First logged event
after backup : 18/04/03 10.49 Time stamp: 0003108F 08460341
Daily planning status:
Under production : No
NCP ready : No
In use ddname of:
Current plan : EQQCP1DS
Job-tracking log : EQQJT03
JCL repository : EQQJS1DS
Current MLOG : EQQMLOG2