Jump to main content
HCL Logo Product Documentation
Customer Support Community
Customer Support HCLSoftware U Community Forums Customer Idea Portal
Workload Automation 10.2.4
  1. Home icon
  2. Welcome
  3. HCL Workload Automation for Z

    Welcome to the HCL Workload Automation for Z documentation, where you can find information about how to install, maintain, and use the product. The documentation has been updated for version 10.2 SPE (Revised April 2025).

  4. Planning and Installation
  5. Installing HCL Workload Automation Agent (z-centric)

    The following topics describe how to install, migrate, and uninstall the HCL Workload Automation Agent (also known as z-centric agent).

  6. Upgrading the z-centric agent
  7. Enabling dynamic capabilities after upgrade
Product logo

  • Product requirements

    This section contains links to the HCL Workload Automation Product Requirements.

  • Detailed System Requirements for HCL Workload Automation, Version 10.2.4
  • Detailed System Requirements for Dynamic Workload Console, Version 10.2.4
  • Overview
  • Mobile Applications Userʼs Guide
  • Dynamic Workload Console User's Guide
  • AI Data Advisor (AIDA) User's Guide
  • Scheduling Job Integrations with HCL Workload Automation
  • HCL Workload Automation

    Welcome to the HCL Workload Automation documentation, where you can find information about how to install, maintain, and use HCL Workload Automation. The documentation has been updated for HCL Workload Automation Version 10.2.4.

  • HCL Workload Automation for Z

    Welcome to the HCL Workload Automation for Z documentation, where you can find information about how to install, maintain, and use the product. The documentation has been updated for version 10.2 SPE (Revised April 2025).

    • Program Directory
    • Dynamic Workload Console Readmes

      For the latest information about a Dynamic Workload Console fix pack, see the appropriate Readme File.

    • Planning and Installation
      • About this publication
      • Planning
      • Installing and migrating HCL Workload Automation for Z
      • Installing Dynamic Workload Console and Z connector

        How to install, upgrade, configure, and uninstall the Dynamic Workload Console and Z connector, which is automatically installed with a Dynamic Workload Console instance.

      • Deploying with containers

        Docker is a state-of-the-art technology that creates, deploys, and runs applications by using containers. Packages are provided containing an application with all of the components it requires, such as libraries, specific configurations, and other dependencies, and deploy it in no time on any UNIX, Windows, and Linux on Z workstation, regardless of any different settings between the source and the target workstation.

      • Deploying AI Data Advisor

        You can deploy AI Data Advisor (AIDA) by using Docker or Kubernetes.

      • Installing HCL Workload Automation Agent (z-centric)

        The following topics describe how to install, migrate, and uninstall the HCL Workload Automation Agent (also known as z-centric agent).

        • Installing the z-centric agent
        • Upgrading the z-centric agent
          • Coexistence with previous versions
          • Upgrading notes
          • Upgrading using twsinst
          • Enabling dynamic capabilities after upgrade
        • Uninstalling the z-centric agent
        • Troubleshooting and maintaining installation, upgrade, and uninstallation
      • Installing HCL Workload Automation Agent on IBM i systems
      • Integrating Workload Automation with Zowe™

        Zowe™ is an open source project that enables you to interact with z/OS through modern interfaces. You can issue Workload Automation commands through the Zowe command-line interface (CLI), and access Workload Automation REST APIs through the Zowe API Mediation Layer (ML).

      • Sample library (SEQQSAMP)

        The SEQQSAMP library contains samples to help you install and customize HCL Workload Automation for Z.

      • Invoking the EQQEXIT macro
      • Invoking the EQQLSENT macro
    • Customization and Tuning
    • Managing the Workload

      You can plan when and how your workload runs and manage it as part of a plan.

    • Scheduling End-to-end with z-centric Capabilities
    • Quick Reference
    • Diagnosis Guide and Reference
    • Workload Automation Programming Language for z/OS User's Guide and Reference
    • Driving HCL Workload Automation for Z
  • Messages and Codes
  • Glossary
  • Notices
 Feedback

Enabling dynamic capabilities after upgrade

To enable dynamic scheduling after you upgraded the HCL Workload Automation Agent without enabling it, see Enabling dynamic capabilities after installation or upgrade.

  • Share: Email
  • Twitter
  • Disclaimer
  • Privacy
  • Terms of use
  • Cookie Preferences