The most direct way to modify an operation is to select option
3 (OPERATIONS) from the MODIFYING THE CURRENT PLAN panel (fast path
5.3) to open the Selecting operations panel. After specifying the
criteria for selecting the operation, the MODIFYING OPERATIONS IN
THE CURRENT PLAN panel opens, as shown in EQQMOPRL
- Modifying operations in the current plan (left part).
This panel lists the operations in the current plan that fulfill
the list criteria you specified. Using row commands, you can perform
the full range of MCP services on these operations.
Note: If
you are using the advanced panels, you can perform these modification
tasks from the:
To display job options and expected duration time,
scroll the list to the right:
Select an operation that belongs to a critical path
and enter the row command to browse information about the target critical
job for the selected operation.
Note: If you are using the advanced panels, see Browsing operation information for
information on how to browse operations.