Running on upgraded operating systems
To run the scheduler on a new version of the z/OS® operating system, you must reassemble the SMF and JES exits mentioned in Step 5. Adding SMF and JES exits for event tracking with the libraries of the new operating system.
If you upgrade the SMP/E environment to a later version of z/OS® by using the SMP/E function BUILDMCS, the relink occurs automatically (ensure that the DDDEF entries for the new operating system are set up correctly by specifying the latest SEZACMTX and SCEELKED libraries). If you do not use BUILDMCS, relink the load modules by using the SMP/E function LINK LMODSCALLLIBS. With this function, all the HCL Workload Automation for Z modules are relinked to the latest SEZACMTX and SCEELKED libraries.