Jump to main content
HCL Logo Product Documentation
Customer Support HCLSoftware U Community Forums Customer Idea Portal
Workload Automation 10.1.0
  • Product requirements
  • Fix pack readmes
  • Overview
  • Mobile Applications Userʼs Guide
  • Dynamic Workload Console User's Guide
  • AI Data Advisor (AIDA) User's Guide
  • Scheduling Job Integrations with HCL Workload Automation
  • HCL Workload Automation
  • HCL Workload Automation for Z
  • Messages and Codes
  • Glossary
  • Notices
  1. Home
  2. HCL Workload Automation for Z

    Welcome to the HCL Workload Automation for Z documentation, where you can find information about how to install, maintain, and use the product.

  3. Planning and Installation
  4. Installing HCL Workload Automation for Z
  5. Migrating

    This chapter provides information to help you plan your migration from HCL Workload Automation for Z version 9.5 with APAR HC00002 installed, to version 10.1 Fix Pack 6.

  6. Migrating actions
  7. Migrating the production environment
 Go to Feedback
  • HCL Workload Automation for Z

    Welcome to the HCL Workload Automation for Z documentation, where you can find information about how to install, maintain, and use the product.

    • Program Directory
    • Dynamic Workload Console Readmes

      For the latest information about a Dynamic Workload Console fix pack, see the appropriate Readme File.

    • Planning and Installation
      • About this publication
      • Planning
      • Installing HCL Workload Automation for Z
        • Installing

          This chapter describes the tasks you perform to install HCL Workload Automation for Z.

        • Verifying your installation

          What to consider when verifying your installation.

        • Migrating

          This chapter provides information to help you plan your migration from HCL Workload Automation for Z version 9.5 with APAR HC00002 installed, to version 10.1 Fix Pack 6.

          • Planning for migration
          • Migrating actions
            • Migrating data sets
            • Migrating the production environment
              • Close down your production system
              • Convert VSAM files to the new system format
              • Initialize the new system
              • Produce a checkpoint data set containing data from the old production system
              • Start the new system
              • Validate the new system
          • Migrating the controller with the IWSZSELFUPGRADE application
          • Installing or upgrading the HCL Workload Automation for Z agent automatically
          • Performing fallback
      • Installing Dynamic Workload Console and Z connector
      • Deploying with containers

        Getting started with containers

      • Deploying AI Data Advisor

        You can deploy AI Data Advisor (AIDA) by using Docker or Kubernetes.

      • Installing HCL Workload Automation Agent (z-centric)

        How to install, migrate, and uninstall the HCL Workload Automation Agent (also known as z-centric agent).

      • Installing HCL Workload Automation Agent on IBM i systems

        Installing HCL Workload Automation Agent on IBM i systems

      • Integrating Workload Automation with Zowe™

        Zowe™ is an open source project that enables you to interact with z/OS through modern interfaces. You can issue Workload Automation commands through the Zowe command-line interface (CLI), and access Workload Automation REST APIs through the Zowe API Mediation Layer (ML).

      • Sample library (SEQQSAMP)

        The SEQQSAMP library contains samples to help you install and customize HCL Workload Automation for Z.

      • Configuration examples
      • Invoking the EQQEXIT macro
      • Invoking the EQQLSENT macro
    • Customization and Tuning
    • Managing the Workload

      You can plan when and how your workload runs and manage it as part of a plan.

    • Scheduling End-to-end with z-centric Capabilities
    • Quick Reference
    • Diagnosis Guide and Reference
    • Workload Automation Programming Language for z/OS User's Guide and Reference
    • Driving HCL Workload Automation for Z

Migrating the production environment

To migrate your production system, perform the following steps:

  1. Close down your production system
  2. Convert VSAM files to the new system format
  3. Initialize the new system
  4. Produce a checkpoint data set containing data from the old production system
  5. Start the new system
  6. Validate the new system
  • Share: Email
  • Twitter
  • Disclaimer
  • Privacy
  • Terms of use
  • Cookie Preferences