TCS approval
In integrated HCL® Marketing Operations and HCL Campaign systems, campaign project templates can require (target cell spreadsheet) TCS® approval before flowcharts run in production mode. If Approval Required is selected on the template, then all rows of the TCS must to be approved before the flowchart can run in production mode. If you run the flowchart in production mode and one or more rows on the TCS associated with this flowchart are not approved, Campaign generates an error.
If the project was created from a template on which the Approval Required check box is not selected, then approval is not required for top-down cells in the TCS. In this case, the TCS grid does not show the approval column or approve all and deny all. Leaving the approval required check box cleared saves time if campaigns do not require TCS approval.
Import and export
If Approval Required is selected, the is approved column is included when you export the project.
If Approval Required is cleared, the is approved column does not export, and only CSV files that match are imported.