Hardware Prerequisites

Given below is the minimum hardware requirement for the HCL CDPdeployment.

Standalone VMs

Server/Node No. of Server/Node CPU Memory Storage Network
Bastion host 1 2 vCPUs for a 7h 12m burst 8.0 GiB EBS only Low to Moderate
Aerospike DB 2 4 vCPUs 16.0 GiB 150 GB NVMe SSD Up to 10 Gigabit
DMP server 1 2 vCPUs 8.0 GiB EBS only Up to 12.5 Gigabit
Druid server 2 16 vCPUs 128.0 GiB EBS only Up to 10 Gigabit
Mongo DB Server 4 4 vCPUs 16.0 GiB 150 GB NVMe SSD Up to 10 Gigabit
Mongo DB Server 1 2 vCPUs for a 4h 48m burst 2.0 GiB EBS only Up to 5 Gigabit
Nifi DB 3 2 vCPUs 16.0 GiB 75 GB NVMe SSD Up to 10 Gigabit
SFTP Server 1 2 vCPUs 8.0 GiB EBS only Up to 12.5 Gigabit
postgres-1 2 2 vCPUs 8.0 GiB EBS only Up to 12.5 Gigabit
RabbitMq 1 2 vCPUs 8.0 GiB EBS only Up to 10 Gigabit
TC Redis 1 2 vCPUs 16.0 GiB EBS only Up to 10 Gigabit
Redis & RMQ for Celery 1 2 vCPUs 16.0 GiB EBS only Up to 10 Gigabit
Scheduler 1 2 vCPUs 16.0 GiB EBS only Up to 10 Gigabit

Openshift Cluster Details

Node CPU RAM Disk
master01 12vCPU 32GB 250GB
master02 12vCPU 32GB 250GB
master03 12vCPU 32GB 250GB
worker02 25vCPU 108GB 300GB
worker03 16vCPU 64GB 300GB
worker04 16vCPU 64GB 300GB
worker05 16vCPU 64GB 300GB
worker06 16vCPU 64GB 300GB
worker01 16vCPU 32GB 300GB
Total 141 492 GB 2550 GB