Pre-installation tasks
A series of pre-installation tasks must be completed before you can deploy the HCL Docs infrastructure. These tasks include installing the system prerequisites and configuring both Windows™ and Linux™ operating systems.
Before proceeding to the pre-installation tasks, make
sure that you have completed these planning activities:
- Determined the required topology and contacted IBM® Techline or your Sales representative for assistance in sizing the system requirements based on the expected number of users.
- Installed the systems or virtual machines with the required operating systems and the latest fix packs applied.
- Provided a network diagram depicting the desired topology with host names, IP addresses, and administrator credentials, enabling creation of the deployment response files.
- Established user IDs and passwords for all systems and middleware.
Completing the following pre-installation tasks now helps to ensure success and reduces the time needed to complete the deployment of the actual HCL Docs components.